After fixing a redline, what should be added to the drawing?

A revision marker and revision block.

Start playing free

  1. A revision marker and revision block ✔
  2. A doodle
  3. A new title

Why: The correction is identified on the drawing with a revision marker, and a revision block is added.

Huh, didn't know that: The correction is identified on the drawing with a revision marker, and a revision block is added.

The dad joke
Revisions leave a paper trail.
Like this card?
Play the game

References

Answer: A revision marker and revision block. The correction is identified on the drawing with a revision marker, and a revision block is added.

  1. Scouting America: Drafting www.scouting.org/merit-badges/drafting
    identify it on the drawings with a revision marker, and add a revision block
    Checked 2026-11-07.

Think this answer is wrong? Tap "Challenge this answer" on the card in the game and tell us why.